From: A strategy for preparing software organizations for statistical process control
Requirements | Evaluation | |||||
---|---|---|---|---|---|---|
Item: Collected Data Measure Evaluated:________________ | ||||||
1. The data collected for the measure are known and have accessible location | S | LS | RS | PS | D | NE |
2. There is sufficient amount of collected data | S | D | NE | |||
3. There is no lost data for the measure or the amount of lost data does not compromise the analysis | S | LS | RS | PS | D | NE |
4. The collected data are precise | S | LS | RS | PS | D | NE |
5. The collected data are consistent | S | LS | RS | PS | D | NE |
Characteristics of the collected data: | ||||||
5.1 The data were collected at the same moment of the execution of the process along the projects | S | LS | RS | PS | D | NE |
5.2 The data were collected under the same conditions | S | LS | RS | PS | D | NE |
5.3 The data compose relatively homogeneous groups | S | LS | RS | PS | D | NE |
6. The data that describe context information of the collected measures are stored and can be retrieved | S | LS | RS | PS | D | NE |
The following data are stored and can be retrieved: | ||||||
6.1 Measurement moment (date, process and activity in which the measurement was carried out) | S | LS | RS | PS | D | NE |
6.2 Measurement conditions (relevant information about the execution of the process, the environment or the project at the moment of the measure collection) | S | LS | RS | PS | D | NE |
6.3 Performer of the measurement | S | LS | RS | PS | D | NE |
6.4 Project in which the measure was collected | S | LS | RS | PS | D | NE |
6.5 Characteristics of the project in which the measure was collected | S | LS | RS | PS | D | NE |